upcarta
  • Sign In
  • Sign Up
  • Explore
  • Search
Mentions
Ramez Naam @RamezNaam · Sep 9, 2022
  • From Twitter

Great paper! I think your conclusions out to 2030 are very reasonable. I do think the bottleneck is much more likely to be demand and firm offtake contracts (along with permitting for all the renewables / transmission needed) rather than supply of electrolyzers per se.

Paper
Probabilistic feasibility space of scaling up green hydrogen supply
by Adrian Odenweller
Post Add to Collection Mark as Completed
Recommended by 1 person
1 mention
Share on Twitter Repost
  • upcarta ©2025
  • Home
  • About
  • Terms
  • Privacy
  • Cookies
  • @upcarta